Allianz Campus
Berlin


System:   KNX, BACnet, Dali
Number of devices:    
Data points:    
Projekt Manager:   Wolfgang Reiser
Client:   Salvia Elektrotechnik
     

The foundation stone for the Allianz Campus in Adlershof, Berlin, was laid on 22 September 2016. The three buildings with flexible office designs are located on an area of 27,000 m2 at the entrance to the Adlershof Technology Park, between Rudower Chaussee and Hans-Schmidt-Straße. The new build with flexible-use office designs will be connected across Merlitzstraße by two pedestrian bridges. The commercial spaces can be accessed via the arcades on Rudower Chaussee. Each building has five storeys. Green areas will adorn the courtyards surrounding the buildings. The building technology is located in the cellar and on the roof.
In this project 0ver 6.000 lights were handed over Dali (Loytec L-Dali) to the MSR via LON for taxation. All fault messages in the buildings were recorded with KNX and transferred to the MSR with KNX-BACnet gateways (Loytec L-Gate 952). The connection of the media technology was also realized by means of BACnet. Two touch pabels (Loytec L-VIS) round off the matter.

Search