New Office Airport
System: KNX, Jung Facility Pilot Number of devices: 1.189 Data points: 2.423 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik Control of lighting via motion detectors. In different departments with constant light regulation. Operation of room functions in the meeting rooms via touch panel and light scenes. Touch-panel in the canteen, kitchen and reception. Integration of security […]
Aquis Plaza
System: KNX, B‑CON Number of devices: 308 Data points: 905 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik Control of the lighting, time and daylight-dependent. Use of a B‑CON-net visualisation. Error messaging via SMS.
Z1 Up Züblinhaus
System: LON, BACnet Number of devices: 34 Data points: 250 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik Control of all lighting, blinds, and doors via LON. All values transferred to MSR technology via BACnet.
STATE PARLIAMENT BUILDING OF BADEN-WUERTTEMBERG
System: LON, BACnet Number of devices: 400 Data points: 2.500 Project Manager: Holger Brenner Client: Johnson Controls Control of all lighting via Dali and DMX; blinds, drives and sensors using measurement, control, and regulation technology (MSR). All values transferred to MSR technology via BACnet.
Opernplatz
System: KNX, Divus Number of devices: 951 Data points: 7.622 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik Control of 25 apartments using KNX and a HomeServer from Divus in connection with a TouchZone TouchPanel.
Porsche training center
System: KNX, Jung Facility Pilot Number of devices: 631 Data points: 1.325 Project Manager: Holger Brenner Client: Salvia Elektrotechnik Control of lighting and blinds via touch panel.
Loom
System: KNX, Dali, B‑CON Number of devices: / Data points: / Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik In 2011 the ECE company took over management of the City Passage, which dates from 1977 and is a very well-known shopping location. As part of an extensive refurbishment, it will now be transformed into a modern […]
Dorotheen Quartier
System: KNX, Dali, B‑CON Number of devices: / Data points: / Project Manager: Sven Kirner Client: Salvia Elektrotechnik The Dorotheen Quartier will be a new hub in the centre of Stuttgart. Located between the old castle, the city hall, and the market hall, the city will reclaim a central quarter that history once tore out. […]
Stadtquartier Q6/Q7
System: KNX, B‑CON Number of devices: 108 Data points: 559 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik Control of lighting, time- and daylight-dependent. Use of a B‑CON-net visualisation. There is also a hotel with daylight-dependent scene control. A range of shops are also equipped with KNX.
Schwabinger Tor
System: KNX, Dali, SMI, BACnet Number of devices: 732 Data points: 10.181 Project Manager: Wolfgang Reiser Client: Salvia Elektrotechnik The ‘Schwabinger Tor’ quarter is currently emerging in the heart of the Schwabing district of Munich. The new district is made up of nine buildings, which stretch from Leopoldstraße to Berliner Straße. An urban mix of […]